Sunday, May 26, 2019

Building update for May 24th

Chris and I headed north with our load of siding.





Murray joined us later that night.

First I installed a pressure system for the cabin water supply.



Had to admire the new bug shelter Rob and Val installed. Turned out ,we needed it as the black flies were vicious!

After leveling the floor we framed in the first window. Bug hats were NOT an option!







Starting to come together.


No comments:

Post a Comment