Rob and I decided (after a couple of cold ones) that it wouldn't be that hard to lay the penstock under the road. So off to work we went. (it was 18C and the black flies were out!)

With a little picking


and a little shoveling ...



and more shoveling .



we hit bedrock .... and quit.  So we laid some pipe..... .


and back filled.



then moved the pipe and the micro hydro generator to the new location.

Now all we need to do is run some wire to the cabin and we're on the grid!!